Mumbai Metro network and corridors At present, only one metro route Mumbai is operational while eight are under-construction and five metro routes in Mumbai have been approved. The first line began operation in June 2014, while two other lines are expected to become operational by March 2022.
Is Mumbai Metro completed?
Another 1.5 km-long tunnel boring work on the 33.5 km line is pending, apart from construction of the stations and other works like signalling, telecommunications, overhead wires etc.
Is Mumbai Metro started?
Mumbai Metro: Maharashtra Chief Minister Uddhav Thackeray has inaugurated sections of two new Mumbai Metro lines nearly eight years after the mass rapid transit system made its entry into the city, metro services on the first phase of Line 2A and also Line 7, both in western suburbs, are now open for commuter use.
Is Mumbai Metro 4 underground?
When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC….Line 3 (Mumbai Metro)
Mumbai Metro Aqua Line 3 | |
---|---|
Number of tracks | 2 |
Character | Underground and at grade |
Track gauge | 1,435 mm (4 ft 81⁄2 in) standard gauge |
Electrification | Overhead 25 kV AC |
Who is constructing Mumbai Metro?
Indian construction firm J Kumar Infraprojects has won a Rs19. 98bn ($280.56m) contract for the Mumbai Metro Rail project in Maharashtra. Awarded by Mumbai Metropolitan Region Development Authority (MMRDA), the contract includes the design and construction of nine elevated stations and an elevated viaduct.
Is Mumbai Metro private?
Line 1 of the Mumbai Metro Line 1 is operated by Mumbai Metro One Private Limited (MMOPL), a joint venture between Reliance Infrastructure (69%), Mumbai Metropolitan Region Development Authority, (26%) and RATP Dev Transdev Asia, France (5%)….
Mumbai Metro | |
---|---|
Top speed | 80 km/h (50 mph) |
showSystem map |
What time is rush hour in Mumbai?
The peak hours are during morning 6.30 AM to 10.30 AM and evening 5 PM to 10 PM. People generally travel towards south Mumbai where most of the offices are located in morning for work and return back in evening.
How many metro lines are currently under construction in Mumbai?
Currently, six different metro lines are under construction in the city. MMRDA has completed 62% of the civil works for the line 2A (Dahisar to DN Nagar) and line 7 (Andheri East-Dahisar E). The trial runs for both are expected in 2020. Phase 1 of the fully underground Metro 3 (Colaba-Bandra-Seepz) is also expected to be operational from 2021.
When will Mumbai’s Metro start?
According to the Mumbai Metropolitan Region Development Authority’s (MMRDA) status report of March 2019, trial runs for three Metro lines – Metro 2B (DN Nagar to Mandale), Metro 4 (Wadala-Thane-Kasarvadavali) and Metro 6 (Swami Samarth Nagar-Vikhroli) – will begin from December 2021.
What are the different colours of the Mumbai Metro?
Key: Blue Line (Line-1) | Yellow Line (lines 2A, 2B) | Aqua Line (Line-3) | Green Line (lines 4, 4A, 10, 11) | Orange Line (lines 5, 12) | Pink Line (Line-6) | Red Line (lines 7, 7A, 9) | Gold Line (line-8) | Purple Line (Line-13) | Magenta Line (Line-14) | Monorail and Thane Metrolite | Navi Mumbai Line-1
Who is the owner of the Mumbai Metro Line?
The Mumbai Metropolitan Region Development Authority (MMRDA) is the owner of the line. In June 2019, a new nodal agency called Maha Mumbai Metro Operations Corporation (MMMOCL) was established to operate and maintain all services on lines owned by MMRDA.